12/3/2015: What’s up with Cherry Street?

This summer, the City began working with National Grid on a gas main installation on Cherry Street. The installation runs from Washington up to River Street. Around the same time they started a water main rehab from Washington up to Derby Street.

Umm maybe just rehab the sewer main while you’re down there? Street is already straight up nuked you guys. Hydrants leaking water everywhere. A long half-buried hose down Cherry Street that I think is carrying gas. Traffic detours. Only thing that could make this worse is winter. 

  
 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s